Siemens at RCUK 2014

The project had a very tight lead time and an extremely difficult install, building a 2 floor structure in only two days. This exhibit required much careful planning and scheduling to make it happen.


We worked closely with the event organisers and expo hall to ensure load-ins would run smoothly, we hired a team of 10 fork lift trucks to raise the deck in the shortest time possible to enable our large and very experienced install team to be able to work at great pace.


The stand comprised of a cafe / meeting area to the upper deck with a presentation theatre down stairs alongside several product and demo areas, the design used the full 6M height availability and certainly stood out amongst the crowd.